What more can I say. Things are starting to take shape and it looks like we could be back to having two baths within the next two weeks. John tiled the counter top this evening. He plans to tile around the tub tomorrow and grout it all on Sunday. If all goes according to plan we could be texturing walls and painting in the evenings next week. We will also be prepping floors so he can tile the bath and hall floors next weekend. Once the floors are tiled we just need to set the toilet and install the final pieces, such as towel racks. Oh, the fun we have.
No comments:
Post a Comment